Within one hundred eighty (180) days after each date established by this Consent Decree for DMG to achieve and maintain a certain PM Emission Rate at any DMG System Unit, DMG shall conduct a performance test for PM that demonstrates compliance with the Emission Rate required by this Consent Decree.īeginning 30 days after entry of this Consent Decree, and continuing thereafter, DMG shall operate each SCR in the DMG System at all times when the Unit it serves is in operation, provided that such operation of the SCR is consistent with the technological limitations, manufacturers’ specifications, and good engineering and maintenance practices for the SCR.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |